With most of the major work, including framing, drywall, as well as rough plumbing and electrical, completed, inspected and approved at our Canyon Crest jobsite, construction is moving along with tile installation at most of the master bath surfaces and fireplace underway.
Tiling should be wrapping up next week and we'll have finish photos to share next month; in the meanwhile, here are a few images of recent work at this Mission Viejo design/build project.
The bath features Porcelanosa wall tile, with river rock stones at the shower floor and quartz tub deck; the master bedroom fireplace is clad with a Japanese glazed porcelain mosaic tile, as seen in the images below.